| Prior to installation, over 1 1/2" of old flooring must be removed. This will allow the new floors to be one level throughout the entire home. |
| Upon removal of old flooring it was discovered that the existing sub-floor was destroyed from termite damage. All damage was removed and a pest control company was called to treat for future protection. |
| New floor joists were installed, along with a new wall bands. |
| 3/4 OSB is glued and nailed to the joists with ring-shank nails after being insulated. |
| The customer requested a walnut rug to be placed in the floor to compliment the pending computer table that would be placed in this location. |
| After sanding, a coat of primer/sealer is applied to start the coating process. |

| White oak floor, Walnut border & diamond, American Cherry center. |